
Planet WBS-512AC
Artikelnr. Pl_Wbs-512AC
Op voorraad
Bestel nu, wij verzenden morgen.
- 15 jaar Intercel-partner
- Persoonlijk advies, 085 401 9230
Aanbevolen doorFrans Maas Specificaties
| Hardware | |
|---|---|
| Standard Support | IEEE 802.11a/n/ac IEEE 802.11i IEEE 802.3 10BASE-T IEEE 802.3u 100BASE-TX IEEE 802.3x flow control IEEE 802.11k, 802.11v, and 802.11r |
| Dimensions (W x D x H) | 87 x 38 x 260 mm |
| Weight | 405g |
| Power Requirements | 48V DC IN,0.5A, IEEE 802.3 at PoE+ or 12V DC IN, 1.0A from DC Jack |
| Power Consumption (max.) | < 10W |
| Interface | Wireless IEEE 802.11a/n/ac, 2T2R PoE: 1 x 10/100/1000BASE-TX, auto-MDI/MDIX, 802.3 at PoE In LAN: 1x 10/100/1000BASE-TX, auto-MDI/MDIX |
| Button | Reset/Pair button, PtP Switch |
| Antenna | Built-in 14dBi directional antenna with dual polarization Half-power beam width Horizontal: 50 degrees Vertical: 15 degrees |
| Data Rate | IEEE 802.11a: up to 54Mbps IEEE 802.11n (20MHz): up to 150Mbps IEEE 802.11n (40MHz): up to 300Mbps IEEE 802.11ac (80MHz): up to 867Mbps |
| Media Access Control | CSMA/CA |
| Modulation | 802.11 a/n/ac: OFDM (BPSK / QPSK / 16QAM / 64QAM / 256QAM) |
| Frequency Band | FCC: 5.180~5.240GHz, 5.745~5.825GHz ETSI: 5.180~5.700GHz |
| Operating Channels | FCC: 36, 40, 44, 48, 149, 153, 157, 161, 165 (9 channels) ETSI: 36, 40, 44, 48, 100, 104, 108, 112, 116, 132, 136, 140 (12 channels) 5GHz channel list will vary in different countries according to their regulations. |
| Max. Transmit Power (dBm) | FCC: up to 25 ± 1dBm ETSI: < 20dBm (EIRP) |
| Receiver Sensitivity (dBm) | |
|---|---|
| Network Mode | Data Rate Receive Sensitivity (dBm) |
| 802.11a | 6Mbps -92 |
| 54Mbps | -75 |
| 802.11n HT20 | MCS0/MCS8 -91 |
| MCS7/MCS15 | -72 |
| 802.11n HT40 | MCS0/MCS8 -88 |
| MCS7/MCS15 | -70 |
| 802.11ac VHT20 | MCS0 -92 |
| MCS8 | -70 |
| 802.11ac VHT40 | MCS0 -89 |
| MCS9 | -65 |
| 802.11ac VHT80 | MCS0 -87 |
| MCS9 | -61 |
| Environment & Certification | |
| Operating Temperature | -20 ~ 70 degrees C |
| Operating Humidity | 5 ~ 90% (non-condensing) |
| IP Level | IP55 |
| ESD Protection | ± 8kV air-gap discharge ± 4kV contact discharge |
| Surge Protection | ± 4kV |
| Regulatory | CE, RoHS |
| Software | |
| LAN | Static IP/DHCP Supports IP-MAC binding |
| WAN Type (GW/WISP mode) |
|
| Wireless Modes |
|
| Channel Width | 20MHz, 40MHz, 80MHz |
| Encryption Type | 64-/128-bit WEP, WPA, WPA-PSK, WPA2, WPA2-PSK, 802.1X |
| Wireless Security | Enable/Disable SSID Broadcast Wireless Max. 32 MAC address filtering User Isolation |
| Max. SSIDs | 4 |
| Max. Wireless Clients | 64 per radio (50 is suggested, depending on usage) |
| Max. WDS Peers | 4 (Up to 3 peers by using “One-click WDS”) |
| Wireless QoS | Supports Wi-Fi Multimedia (WMM) |
| Wireless Advanced | Auto Channel Selection 5-level Transmit Power Control (Max. (100%), Efficient (75%), Enhanced (50%), Standard (25%), Min. (12.5%)) Client Limit Control, Coverage Threshold Wi-Fi channel analysis chart Fast Roaming(IEEE 802.11k, 802.11r, 802.11v) |
| Status Monitoring | Device status, wireless client List PLANET Smart Discovery DHCP client table System Log supports remote syslog server |
| VLAN | IEEE 802.1Q VLAN (VID: 3~4094) SSID-to-VLAN mapping up to 4 SSIDs |
| Self-healing | Supports auto reboot settings per day/hour |
| Management | Remote management through PLANET DDNS/Easy DDNS Configuration backup and restore Supports UPnP Supports IGMP Proxy Supports PPTP/L2TP/IPSec VPN Pass-through SNMP v1/v2c/v3 support, MIB I/II, Private MIB |
| Central Management | Applicable controllers: WAPC-500, WAPC-1000, NMS-500, NMS-1000V |
Omschrijving
Flexible and Reliable Outdoor Wireless Solution with Superior Performance
PLANET WBS-512AC 802.11ac WAVE 2 900Mbps Outdoor Wireless CPE offers a better range and excellent throughput than those of the traditional wireless device. With the standard IEEE 802.3at Power over Ethernet (PoE) design, the WBS-512AC can be easily installed in the areas where power outlets are not available. The WBS-512AC is definitely suitable for wireless IP surveillance, and bridge link of building to building and backbone of public service. Additionally, the self-healing capability keeps connection alive all the time. With the IP55-rated outdoor enclosure, the WBS-512AC can perform normally under rigorous weather conditions, meaning it can be installed in any harsh, outdoor environments.

Benefits of MU-MIMO under 802.11ac Wave 2
With the MU-MIMO Wave 2 technology, the WBS-512AC, installed in public areas such as hotspots, airports and conferences, reduces the frustration that Wi-Fi users often experience in downloading web pages, e-mail file attachments and media contents. For cellular operators, the WBS-512AC provides a better Wi-Fi user experience, reducing the likelihood of users turning off Wi-Fi and putting more load on the cellular network. For enterprises, this technology also can solve Wi-Fi congestion issues in open work spaces and conference rooms.

Designed for Various Requirements
The WBS-512AC is specially designed for long-distance outdoor surveillance and wireless backhaul solutions that are capable of establishing stable bridge connection through the embedded 14dBi unidirectional antenna. To provide maximum performance, the WBS-512AC can implement up to 6 operation modes and is easy to use where a multitude of applications in communities, warehouses, campuses, harbors, etc. can be made.

3 Simple Steps to Set Up PtP Connection
Without needing to enter the Web interface for configuration, the WBS-512AC has the DIP switch for setting to master (AP mode) and to slave (repeater mode). User only needs three simple steps to establish the PtP connection without any difficulty. By just switching the button to “Master” on the master AP, and pressing the reset button, the PtP connection can be established in 2 minutes as the connection steps are shown below.

Multiple SSIDs with VLAN Tagging
The WBS-512AC supports WPA/WPA2, and the 802.1X RADIUS authentication to secure the wireless connection. Besides, the supported IEEE 802.1Q VLAN allows multiple VLAN tags to be mapped to multiple SSIDs to distinguish the wireless access. This makes it possible for the WBS-512ACN to work with managed Ethernet switches to have VLANs assigned to a different access level and authority.

Flexible and Reliable Outdoor Characteristics
The WBS-512AC is definitely suitable for wireless IP surveillance, and bridge link of building to building and backbone of public service. Additionally, the self-healing capability keeps connection alive all the time. With the IP55-rated outdoor enclosure, the WBS-512AC can perform normally under rigorous weather conditions, meaning it can be installed in any harsh, outdoor environments. With the flexible DC input or Power over Ethernet (PoE) option, the WBS-512AC can be easily installed depending on the environmental condition.
Optimized Efficiency in AP Management
The brand-new GUI configuration wizard helps the system administrator easily set up the WBS-512AC step by step. Besides, the built-in Wi-Fi analyzer provides real-time channel utilization to prevent channel overlapping to assure greater performance. With the automatic transmission power mechanism, distance control and scheduling reboot setting, the WBS-512AC is easy for the administrator to deploy and manage without on-site maintenance. Moreover, you can use PLANET NMS-500 or NMS-1000V AP control function to deliver wireless profiles to multiple APs simultaneously, thus making the central management simple.

Vragen
Wanneer wordt mijn bestelling verzonden?
Op een werkdag vóór 15:00 uur besteld, verzenden we dezelfde dag nog. Na 15:00 uur of in het weekend verzenden we de volgende werkdag.
Zijn de prijzen exclusief btw?
Ja. De winkelprijs is exclusief btw. U ziet ook het bedrag inclusief btw. De productgegevens voor zoekmachines gebruiken de prijs exclusief btw.
Kan ik een oud typenummer opzoeken?
Ja. Op de homepage zoekt u een Wetac- of Intercel-nummer. U komt bij de opvolger uit als die in de shop staat.


